Description
The Copa Star Hospital is one of the most modern medical facilities in Brazil. With a 10,000 m² construction footprint on five floors, this $115 million project includes 150 beds, 45 ICU and 105 rooms, nine operating rooms and diagnostic center.
Products Used
PENETRON ADMIX was used throughout the concrete of the hydrostatic slab and the poured-in-place retaining walls, to ensure the low permeability of the concrete and the structural durability. PENEBAR SW-55 waterstop was used for the concrete construction joints.
Related Media Releases
September 19, 2016