Description
The expanded Iguatemi Fortaleza Mall in Brazil added a three-floor building integrated into the previous main structure that include movie theaters and more designer shops. In addition to the new entertainment facilities and retail areas, a new underground loading dock was added to streamline the mall’s logistics.
Products Used
A new foundation, slab along with supporting elements, were integrated into the design; about 3,000 m3 (3,920 cubic yards) of concrete were treated with PENETRON ADMIX to ensure a durable underground foundation. Finally, about 1,000 m (3,300 feet) of PENEBAR SW-55 waterstop tape was installed in the concrete joints.