he newly completed Rudisill Consolidation Sewer is a near-surface sewer that captures combined sewage and stormwater overflow. The completion of this $6 million project is part of the City Utilities’ 18-year Long Term Control Plan and an essential effort to better control combined sewer overflow events (CSOs), which occur during wet weather storms approximately 72 times a year in the Fort Wayne area.
Products Used
PENETRON ADMIX SB was specified to treat approximately 1,600 cubic yards of concrete at the new consolidation sewer. The sewer is three feet (91 cm) thick and the walls are 40 inches (>1 m) thick.