Description
Now one of the highest capacity airports in Southern Asia, the Bangalore Airport was faced with a very tight construction schedule that left little time for delays.
Products Used
The project authorities switched to PENETRON ADMIX after rejecting a PVC membrane proposal – saving over 3 months in the construction schedule.