Description
The Cascade Hydro Power Stations stretch for over 235 km (146 mi) with the projected capacity of 38.6 Giggo Vatts. The concretes surfaces of four Cascade Hydro Power Stations: Yegorlykskaya, Kurshavskaya, Barsuchkovskaya and Sengileyevskay were treated with PENETRON.
Products Used
PENETRON and PENETRON ADMIX were used in all four of the hydro power station. In addition, PENEBAR was used to ensure impermeability of the major reinforced concrete pipelines’ seams at Kurshavskaya Hydro Electro Station.