Water Treatment & Storage

Chatham, MA Water Treatment Plant

Chatham, MA, USA

Description

The Chatham project included construction of a 1.44-million gallons per day (MGD) drinking water treatment facility to remove PFAS as well as iron, and manganese from the town’s existing groundwater wells 5 & 8. The work comprised new pumps, new chemical systems, greensand and granular activated carbon filtration vessels, SCADA system, electrical and HVAC systems.


Products Used

Once treated with PENETRON ADMIX SB, concrete is impermeable to water and chemicals, even under the constant hydrostatic pressure typical for water treatment plants. In addition, its ability to permanently self-heal any future microcracks prevents any damage from occurring over the service life of the concrete.


Related Media Releases


June 25, 2026

Penetron Helps Massachusetts Town Meet Tighter PFAS Standards


Back to Projects

Products Used

PENETRON ADMIX SB

PENETRON ADMIX SB

Crystalline Waterproofing


Back to Projects