Description
The tunnel lining rehabilitation focused on upgrading waterproofing and drainage to control water ingress and improve long-term structural performance. The original design called for a dimpled membrane system to direct water inflows to through drains and half-pipes into a drainage channel and covered
Products Used
As part of the waterproofing and repair process, PENETRON ADMIX, a crystalline admixture for concrete, was proposed as an optimal waterproofing enhancement for the shotcrete layers. PENETRON, a topical crystalline waterproofing material and PENEPLUG, a rapid-setting crystalline compound, were also specified to stop active leaks and repair surface cracking in the tunnel walls
Related Media Releases
October 16, 2026






