Description
ECU (Eastern Carolina University) needed repairs for their failing steam and condensate lines around campus. As the campus grew, upgrades to the current steam distribution system were required to each new building.
Products Used
PENETRON ADMIX was applied to the basement retaining walls that housed the new steam and condensate lines around campus. The Penetron crystalline system was specified to ensure long-lasting concrete protection for this upgraded system.




