Education

ECU Steam Plant Tunnel Phase I

Winterville, NC, USA

Description

ECU (Eastern Carolina University) needed repairs for their failing steam and condensate lines around campus. As the campus grew, upgrades to the current steam distribution system were required to each new building.


Products Used

PENETRON ADMIX was applied to the basement retaining walls that housed the new steam and condensate lines around campus. The Penetron crystalline system was specified to ensure long-lasting concrete protection for this upgraded system.


Back to Projects

Products Used

PENETRON ADMIX

PENETRON ADMIX

Crystalline Waterproofing


Back to Projects