Description
The upgrades and flood protection measures made at the Stage II Wastewater Treatment Plant comprise a new flood wall (above the 500-year flood elevation), new sludge storage tank and post-aeration system, new ultraviolet disinfection system, new effluent pump station and stormwater pump station, replacement of process aeration blowers and diffusers, new stormwater piping, and bioretention swale.
Products Used
For the construction of the flood control structures and new wastewater treatment plant components, PENETRON ADMIX SB, a crystalline waterproofing admixture was added during the batching process by Silvi Concrete, the ready-mix concrete supplier.
Related Media Releases
December 10, 2025




