Description
This new residential building includes offices and commercial space on the ground floor, as well as a parking garage in the basement.
Products Used
Project architects and engineers specified treatment with the PENETRON System for all below-ground concrete structures for a waterproof and durable solution, which also helps extend the life span of concrete by at least 60 years. PENETRON ADMIX was used directly in the concrete mix; PENEBAR SW-45 waterstop was applied on all resulting construction joints to ensure impermeability.






