Description
The Sheraton Grande Tbilisi Metechi Palace reopened after a four-year closure and a $50 million refurbishment that completely revamped both the exterior and interior. The hotel’s comprehensive make-over included a full redesign of all 220 rooms and suites, expanded and updated fitness and spa facilities, new restaurants, bars and a club lounge. The hotel’s conference and events center was expanded and now features Tbilisi’s biggest ballroom and 12 meeting rooms (total area: 2,600 m2). The hotel also added a two-level parking garage and a casino.
Products Used
For the Sheraton Grande Tbilisi Metechi Palace, PENETRON ADMIX-treated concrete was used to construct the parking garage, the below-grade structures for the expanded spa, business center and casino, and other basement structures. PENETRON, a topical crystalline material, and PENECRETE MORTAR, a waterproof sealing grout, were used in combination to patch tie-holes and protect the old and existing exposed concrete structures from water penetration originating from the groundwater.
Related Media Releases
August 25, 2020