Description
3C and Maschmeyer used Penetron Crystalline Technology almost exclusively to protect the Spillway structure and discharges on the C-51 canal near the Palm Beach Aggregates facility.
Products Used
PENETRON ADMIX SB was used to seal 2,000 yd3 of the spillway structures. The use of Penetron Technology ensures long lasting concrete durability and self-healing concrete.