Manufacturing

Edy’s Grand Ice Cream Production Facility

Fort Wayne, IN, USA

Description

Due to the groundwater levels at the construction site, Graber & Graber Contractors, the project’s general contractor, specified a concrete waterproofing solution for the elevator pits and other key below-grade concrete elements that are part of the Fort Wayne production facility expansion. Speedway Redi Mix, the ready-mix concrete supplier, added PENETRON ADMIX to the concrete mix.


Products Used

Once added to the concrete mix, PENETRON ADMIX’s active ingredients react in a catalytic reaction to the moisture in concrete. This reaction generates a non-soluble crystalline formation throughout the pores and capillary tracts of the concrete. The entire concrete matrix is now impermeable, stopping the penetration of groundwater and moisture from any direction.


Related Media Releases


March 14, 2024

Edy's Grand Ice Cream Chooses Penetron to Waterproof Production Facility Concrete Structures


Back to Projects

Products Used

PENETRON ADMIX

PENETRON ADMIX

Crystalline Waterproofing


Back to Projects