Water Treatment & Storage

El Cuchillo II Aqueduct

Nuevo León, Mexico

Description

Buried at a depth of 22 m (73 ft) with a diameter of 2.13 m (7 ft), the first 5 meters of the aqueduct are covered by a reinforced concrete slab, eliminating the need for floating pumps to extract water when the reservoir level is low. The aqueduct comprises five plants (each with six pumps) located at intervals of 20-25 kilometers and transports 5,000 liters (1,320 gallons) of water per second.


Products Used

CEMEX México, the ready-mix concrete supplier for the aqueduct, specified PENETRON ADMIX, a crystalline waterproofing admixture for all concrete structures. PENEBAR SW-55 swellable waterstop strips were also installed along the construction joints to ensure permanent seals that could resist the high hydrostatic pressure.


Related Media Releases


June 18, 2024

Key Water Aqueduct for Monterrey, México, Specifies Penetron to Ensure 50-Year Design Durability


Back to Projects

Products Used

PENETRON ADMIX

PENETRON ADMIX

Crystalline Waterproofing


PENEBAR SW-55

PENEBAR SW-55

Waterstops


Back to Projects