Fisher Flume is part of the water transfer system for the Fisher Power Station on the Fisher River in Mersey, as part of the Mersey – Forth Hydro Development in Tasmania. Water from Lake McKenzie flows via flumes, canals, tunnels and pipes to the Fisher Power Station. The water has a vertical drop of 650 m (2,145 feet) from the lake to the Fisher Power Station.


Products Used

As part of a refurbishment program, PENETRON ADMIX was used over a total surface area of 7,150 m2 for the concrete overlay and the Flume water conduit sections.