Construction of the Green Heart Office Complex included the comprehensive renovation of two existing buildings (each with four floors) and the construction of three new buildings (each seven floors tall). Located on Milutina Milankovića Boulevard in the New Belgrade central business district, the Green Heart business complex now comprises five buildings with 46,000 m2 of office space and three underground levels of parking accommodating 900 cars.
Products Used
The full range of the Penetron System was incorporated into the Green Heart project. PENETRON ADMIX was used to treat around 2,300 m3 (3,000 cubic yards) of concrete for the foundation slabs and underground garage structures. The resulting construction joints were permanently sealed with PENEBAR SW-55 waterstop strips. The ongoing repairs to the existing retaining walls were carried out with a combination of PENEPLUG, a rapid-setting, crystalline compound that quickly stops active leaks, PENECRETE MORTAR, to fill cleaned and prepped cracks, and finally, a layer of PENETRON, a crystalline material, as a topical application to the repaired surfaces to ensure a waterproof structure
Related Media Releases
April 23, 2020