Transport

Linn Road Bridge

Mansfield, OH, USA

Description

The bridge renovation project included complete replacement of the original 40-foot steel bridge span with a new concrete pre-cast box beam span. In addition, the previous bridge abutment was upgraded with new concrete footings.


Products Used

Added to the concrete mix by Moritz Concrete during the batching phase, PENETRON ADMIX creates a non-soluble crystalline network, which forms throughout the pores, capillaries, and microcracks of the concrete to optimize durability of the new concrete elements with enhanced impermeability to reduce any future intrusion of water and de-icing salts into the concrete matrix.