Description
Despite the high water table in this part of Batumi, the use of PENETRON technology allowed the architects – thanks to a proposal from PENETRON Georgia – to move the 1,800 m2 (19,000 square foot) parking garage from the ground level to a below-ground level. The now available ground level area was transformed into retail space.
Products Used
About 1,500 m3 (1,960 cubic yards) of concrete were treated with PENETRON ADMIX to enhance impermeability; PENECRETE MORTAR was used to seal 300 m (985 feet) of cracks.