Description
The new MiTek Vietnam Office 2 building is located in the Tân Thuận Đông Industrial Park. With a construction area of over 18,000 m2, the project comprises eight above-ground floors of office space and two below-grade basement levels.
Products Used
When PENETRON ADMIX is added to the concrete mix, it reduces permeability by generating a network of insoluble crystals that permanently seal microcracks, pores, and capillaries normally found in concrete. This effectively blocks water penetration, even under the hydrostatic pressure commonly encountered at construction sites in the Mekong River Delta region. PENETRON, a crystalline waterproofing material, which is topically applied as a slurry, promotes concrete impermeability in a similar process to prevent concrete deterioration.
Related Media Releases
April 16, 2024