Tunnel

Pirelli Utility Tunnel

Turin, Italy

Description

Part of an expansion project at the Pirelli tire factory in Turin, tunnels were added to provide crucial service connections for gas and electrical lines between the main buildings and a steam-generating station. PENETRON technology ensured a durable structure for three underground gas and electrical supply tunnels at the plant.


Products Used

PENETRON ADMIX was used to treat 1,500m3 (1,960 cubic yards) of concrete for all tunnel structures. PENEBAR was also used to seal the construction joints, including the openings for the PVC pipes and the water supply and valve injection tubes.


Related Media Releases


September 8, 2014

Pirelli Goes Underground with PENETRON


Back to Projects

Products Used

PENETRON ADMIX

PENETRON ADMIX

Crystalline Waterproofing


Back to Projects