Description
The newly completed Quail Meadows 3 lift station is part of the city’s ongoing Capital Improvement Projects (CIP) to improve and expand the local wastewater collection system. The Quail Meadows 3 project comprised the construction of a new lift station with a wet well, a dry well, pumps, valves, piping, electrical and control systems, and a relocated generator.
Products Used
Penetron worked with Norwalk Ready Mix, the concrete ready-mix supplier, to add Penetron’s antimicrobial admixture to the concrete mix during batching. The admixture is permanent; it forms part of the concrete matrix and is leach resistant. The effectiveness of the antimicrobial admixture is not lessened by repeated contact with bacteria.