Description
The 114,000 m2 (1.25 million square feet) Fortaleza construction site was secured with 4,000 piles driven into the soil before construction could begin. Today it offers shoppers access to no less than 385 stores, including movie cinemas and food courts.
Products Used
PENETRON ADMIX was used to treat over 1,200 m3 (1,570 cubic yards) of concrete for both the underground and rooftop water reservoirs at Rio Mar. About 1,000 m of PENEBAR SW waterstop strips were used to permanently seal the construction joints. The reservoirs are located on the rooftop and underground; they supply all drinking water needs for the shopping mall and its food courts.