Description
The US$42 million Sencorp-SURA project combines two adjacent towers (20-floors and 11-floors high) within a single, modernist complex. The towers’ ground level integrates a paved plaza with green areas on top of 6 underground floors for parking.
Products Used
PENETRON ADMIX was added to the concrete mix during batching for the concrete retaining walls and foundations to completely waterproof and prevent seepage of the six below-grade floors that comprise the underground parking garage. PENEBAR SW-45, a swellable waterstop, was used to permanently seal the construction joints.
Related Media Releases
June 9, 2021