The 230,000 square-feet (21,000 m2), $50 million facility is less than two miles from the Salt Lake City International Airport. Situated on a 62-acre site, the facility comprises multiple halls (each about 45,000 square feet/4,100 m2) and was completed in about 18 months by the Wadsworth Construction Company.


Products Used

The concrete used for the facility’s raft slab, or frost-protected shallow foundation, was supplied by American Eagle, the project’s ready-mix supplier. Treated with PENETRON ADMIX to protect against the groundwater levels at the site, the concrete is now resistant to concrete deterioration caused by chemical attack, freeze-thaw cycles and corrosion, while withstanding hydrostatic pressure at the site.


Related Media Releases


December 10, 2019

New Utah Rail Manufacturing Site Rolls on Penetron Technology


Back to Projects

Products Used

PENETRON ADMIX

PENETRON ADMIX

Crystalline Waterproofing


Back to Projects