Transport

State Route 30 Bridge Renewal

MS, USA

Description

The Mississippi Department of Transportation (MS DOT) approved a $1.76 million project budget for the complete renovation of the State Route 30 bridge between CR 121 and SR 793 in Tishomingo, MS. Completion of the project will help minimize future maintenance and avoid any further damages that would make a costly bridge replacement necessary in the future.


Products Used

The Mississippi DOT approved the application of PENETRON ADMIX-treated concrete for the bridge deck overlay. Initially, the damaged concrete surface of the bridge (two-lanes wide) was hydro-blasted to expose the top layers of reinforcing steel. The exposed concrete structure was then covered with the PENETRON ADMIX-treated concrete, ensuring a high degree of impermeability and optimal protection against any future intrusion of water and de-icing salts.


Related Media Releases


September 29, 2020

Penetron Helps Prevent Freeze-Thaw Damage in Mississippi


Back to Projects

Products Used

PENETRON ADMIX

PENETRON ADMIX

Crystalline Waterproofing


Back to Projects