Surabaya Waste-to-Energy Power Plant

Benowo, Surabaya City, East Java, Indonesia

Description

The first garbage power plant in Indonesia that covers 37 hectares (91 acres), this power plant was built in the Benowo landfill area of Surabaya on the island of Java. The plant’s daily incineration capacity is 1,300-1,500 tons of garbage.


Products Used

Pionir Beton & SCG Beton treated 4,000 m2 with a topical application of PENETRON, a crystalline waterproofing material, to ensure the durability of the plant’s waste pit structures.