Residential

Trinity Landing

Wilmington, NC, USA

Description

The Trinity Landing retirement community development is located just south of Wrightsville Beach and overlooks the Intracoastal Waterway. The 514,426 ft2 community spans two campuses; the initial phase of construction comprised 184 wood-framed multi-story apartment homes (800-1,660 ft2; 1–2-bedroom layouts), two-story villas (1,165-1,765 ft2), and a waterfront pavilion and boat dock. An additional 24 units will be added in late August during a second construction phase. Further amenities include three restaurants, a wellness center with a saltwater pool and spa, walking and biking paths, an auditorium, a library and media center, and meeting rooms.


Products Used

Easily mixed in during batching and unaffected by climatic conditions, PENETRON ADMIX SB quickly becomes an integral part of the concrete as the active ingredients in the admixture react to generate an insoluble crystal network. This crystal network seals voids and microcracks against water penetration, even under high hydrostatic pressure. Water is unable to pass through the crystal formations, making the concrete impermeable. Because the concrete is impermeable, chloride ion penetration is decreased, providing the much-needed corrosion protection in a coastal environment


Related Media Releases


August 2, 2022

Trinity Landing Looks to Penetron to Protect Concrete Basements from Deterioration


Back to Projects

Products Used

PENETRON ADMIX SB

PENETRON ADMIX SB

Crystalline Waterproofing


Back to Projects