Description
Due to the age of the existing facility and the demand for increased treatment capacity, this $4.5 million project expanded and upgraded the Memphis treatment facility by adding new oxidation ditches, clarifier tanks, headworks facility, and a dewatered sludge storage building.
Products Used
The new PENETRON ADMIX-treated concrete elements for the Memphis plant included the headworks structure, grit chamber, aeration oxidation oval, two clarifiers, and disinfection system. Delivered in pre-measured soluble bags, PENETRON ADMIX SB was added to over 1,100 cubic yards (844 m3) of concrete.
Related Media Releases
June 15, 2021